Spec 2: PACE PlanFlow BRD/FRD/TSD  •  APP 02 SPEC
CLIENT & FULFILLMENT ENTERPRISE
LOWE-MARTIN GROUP • EST. 1908
•
LMX SOLUTIONS FULFILLMENT • OMNICONNEX
×
COMMERCIAL CREATIVE & AGENTIC AI PARTNERS
BRILLIANTZ COMMERCIAL & BRAND SYSTEMS
•
Cogneris. CORE CRM & PACE AI

App 02: PACE PlanFlow™ — Complete BRD, FRD & TSD Specification

Ticket Reference: LMX-500.2 (Parent: LMX-500 · Offering 1B)

iOS Bundle ID & Display Name: com.cogneris.lmx.planflow · PlanFlow

Web Desk Route: /apps/planflow.html

Primary Persona & Co-Agent: J. Chen (Master Scheduler, Ottawa & Mississauga) · Co-Agent: JARVIS · Cronos

UI Architecture: Cogneris EPPM Web Desk Shell (desk-bg.jpg wallpaper + 65% glass frost) & Mobile @native/DeskKit (72% dark / 88% light frost + 5-slot 84pt floating bottom bar)

Date: 2026-11-19


1. Business Requirements Document (BRD)

1.1 Executive Problem Statement

In multi-plant commercial print, folding carton, direct mail, and LMX fulfillment operations, Sales frequently promises delivery dates in the dark without visibility into real-time press, die-cutting, bindery, or kitting queues across Ottawa (400 Hunt Club Rd.) and Mississauga (GTA). Furthermore, jobs regularly remain on the 72-hour press schedule even when their specialty paper PO (PurchaseOrderLine) has not arrived at the dock or their customer prepress proof (JobPartPrepressOp) is still unapproved, forcing expensive last-minute press wash-ups, unplanned overtime, and missed SLAs.

1.2 Business Objectives & Target KPIs

  • BO-PF-01 (Real-Time Pre-Quote Promise-Date Feasibility): Give Sales and Master Schedulers instant (Green / Amber / Red) promise-date windows across Ottawa and Mississauga before a quote or order commitment is signed. Target: >98.5% on-time delivery SLA adherence.
  • BO-PF-02 (Eliminate Last-Minute Press Schedule Collisions): Continuously monitor the 72-hour press horizon for unreceived paper POs, unapproved prepress proofs, or missing carton dies (72-Hour Material & Proof Watchdog). Target: >60% reduction in emergency press reschedules within 48 hours of run time.
  • BO-PF-03 (Governed Rush-Order Simulation): Simulate inserting a rush order into PACE Scheduling / PrintFlow 4D without corrupting the live finite schedule, calculating exact overtime cost, displaced jobs, and Ottawa-to-Mississauga overflow options before the Master Scheduler commits.

1.3 Stakeholders & Personas

  • Executive Sponsor: Sebastián Gonzalez (SVP, Sales & Marketing — The Lowe-Martin Group / LMX Solutions)
  • Primary Handset & Desk User: J. Chen (Master Scheduler — Ottawa & Mississauga Plants)
  • Collaborating Users: K. Patel (Senior Estimator), M. Tremblay (Account Executive), Plant Superintendents

2. Functional Requirements Document (FRD)

2.1 Core Functional Requirements (FR-PF-001 – FR-PF-008)

Req IDRequirement NameFunctional SpecificationAcceptance Criteria
FR-PF-001Cross-Plant Capacity Horizon (Ottawa × Mississauga)Display a synchronized 14-day department load strip across Ottawa (40-inch Offset Press, Bobst Die-Cutter/Folder-Gluer, MBO Bindery, Canada Post Mailstream) and Mississauga (HP Indigo Digital/VDP, Wide Format Flatbed, LMX Kitting Pods 1–4).Updates every 15 minutes from v_lmx_schedule_horizon_14d and real-time PaceConnect webhooks.
FR-PF-002Pre-Quote Promise-Date Traffic LightEvaluate any proposed job route and quantity against open department hours, substrate lead times, and inter-plant transit (5.5-hr Hwy 401/416 corridor).Returns GREEN (Standard), AMBER (Split Plant / Second Shift), or RED (Bottleneck — Alternate Date Required) with earliest feasible ship date.
FR-PF-00372-Hour Paper PO & Proof Readiness WatchdogScan all JobPlan operations scheduled within T-72h and cross-check PurchaseOrderLine.dateReceived, InventoryItem.qtyOnHand, and JobPartPrepressOp.proofApproved.Raises an actionable Watchdog Hold card at T-72h if paper is unreceived or proof is unapproved, recommending a safe swap candidate from the ready backlog.
FR-PF-004PrintFlow 4D Rush Order What-If SimulatorSimulate inserting a high-priority order into the schedule and compute: (a) displaced jobs and their SLA slack, (b) overtime cost vs. rush fee, and (c) cross-plant offload alternative.Previews Before → After schedule impact and writes to lmx_printflow_whatif_staging only after Master Scheduler approval.
FR-PF-005Auto-Count 4D Live Floor TelemetryIngest real-time press status (Running, Makeready, Held for Stock, Completed) and good-sheet counts from Auto-Count 4D / JobCost.Highlights any active job drifting >30 mins behind scheduled completion.
FR-PF-006Five Management Questions EngineResolve Where are we? How far off? What moved? What is it costing? What are the options? across Ottawa & Mississauga plant schedules.Consistent answers across Web Desk, Mobile Home/Ask tabs, and voice/text queries.
FR-PF-007EPPM Web Desk Shell ExperienceFull-bleed desk-bg.jpg wallpaper plate (12px inset, 22px radius), floating frosted glass top bar, artifact windows (20px radius), floating mic control pill, and right Conversation / Exhibits / Artifacts drawer.Passes WCAG AA contrast (≥4.5:1) in both dark and light desk themes.
FR-PF-008EPPM Mobile @native/DeskKit 5-Slot StandardRoot <Desk> wallpaper, floating 44pt <DeskHeader>, frosted <Card>/<Panel> components (16pt radius, 1pt lit top edge), and floating 84pt 5-slot bottom bar (Home · Work · [JARVIS Mic] · Chat · Activity).Compiles natively via xcodebuild and installs on iPhone "Mini Me" (com.cogneris.lmx.planflow).

2.2 Mobile 5-Slot Navigation Mapping (DOCS/NAV_STANDARD.md)

  1. Slot 1 — Home (Now):
  • Floating <DeskHeader title="PlanFlow" sub="J. Chen" /> with standing <HeaderStat label="On-Time" value="98.4%" /> and <HeaderStat label="Alerts" value="3" /> + <SettingsButton />.
  • Cross-Plant Load Bar (Ottawa 84% · Mississauga 76% · LMX Kitting 91%).
  • Needs Your Attention card (72-Hr Watchdog: Job #49210 18pt SBS Board PO unreceived for Thu 06:00 press slot, Rush Sim pending approval for NorthStar Q1 Loyalty Drop, Prepress Proof overdue on Job #49218).
  • ✦ JARVIS · CRONOS BRIEFING card + ✦ Ask Cronos anything… frosted pill.
  1. Slot 2 — Work (Badged with actionable count):
  • <Segments> pill bar (height: 32pt):
  • All (8) · 72-Hr Watchdog (3) · Rush Sim (2) · Ottawa Press (2) · Mississauga (1)
  • Inline actions: Approve Slot Swap (#49210 ↔ #49224), Stage PrintFlow What-If, Hold Press Slot & Ping Purchasing.
  1. Center Slot — [JARVIS Mic] (Raised 42pt disc, no text label):
  • <ChipRow> with the 5 Management Questions + PlanFlow prompts ("Can we deliver 50,000 Apex kits by Nov 29 without overtime?", "Hold Ottawa Press 2 slot on Thu 06:00 and swap in Job #49224").
  • Interactive Before → After Schedule Delta Preview Card showing affected press hours, SLA slack, and overtime cost before committing.
  1. Slot 3 — Chat:
  • <Segments>: Threads · People (K. Patel, M. Tremblay, Sebastián Gonzalez, Ottawa Press Lead).
  1. Slot 4 — Activity (Newsfeed):
  • Live stream of PaceConnect JobStatusChanged events, Auto-Count 4D press completions, and PurchaseOrderReceipt dock scans.

3. Technical Specification Document (TSD)

3.1 ePS Pace & PrintFlow 4D Integration Boundary

  • Read Layer (v_lmx_schedule_horizon_14d & v_lmx_72hr_readiness_watchdog):
  • Queries job, jobpart, jobplan, department, costcenter, purchaseorderline, and inventoryitem every 15 minutes.
  • Controlled Write Boundary:
  • PlanFlow never directly overwrites the live PrintFlow 4D finite schedule board.
  • Approved schedule holds or priority notes execute UpdateObject(JobPlan) (updating JobPlan.notes / readiness flag) and insert a scenario payload into lmx_printflow_whatif_staging for Master Scheduler import into PrintFlow 4D.

3.2 Native iOS & Web Desk Tokens (DeskKit)

  • Bundle Identifier: com.cogneris.lmx.planflow
  • Signing Team: 6626QFDMK2 (Apple Development: Peter Jones)
  • Accent Token: #14b8a6 (LMX Teal)
  • Frost Parameters: PANEL_BLUR = 34, CHROME_BLUR = 44, PANEL_FILL = rgba(20,26,40,0.72) (dark) / rgba(247,244,238,0.88) (light), EDGE_COLOR = rgba(255,255,255,0.10), EDGE_LIT = rgba(255,255,255,0.14), PANEL_RADIUS = 16pt, GUTTER = 12pt.